Sample type: Construction material etc.
Analysis type: Organic compounds
Analysis of substance: | Report limit: |
---|---|
fraction C5-C6 | 2.5 mg/kg |
fraction >C6-C8 | 2.5 mg/kg |
fraction C8-C10 | 5 mg/kg |
fraction >C10-C12 | 5 mg/kg |
fraction >C12-C16 | 10 mg/kg |
fraction >C16-C35 | 10 mg/kg |
fraction >C35-C40 | mg/kg |
Sum >C12-C35 | mg/kg |
fraction >C10-C40 (sum) | mg/kg |
THC screening, > C5-C40 in building material [OG-20g]
Package info
1.100 NOK / sample5 work days
09:00 Express
1
Construction material etc.
Organic compounds
50 g
Glass
REFLAB 1 2010
Yes, Fastest delivery 09:00 express: 300% addition, 12.00: 275%, 1 day: 100%, 2d: 75%, 3d: 50%
Yes
If there is much organic matter in the sample cleanup could be appropriate.
This package is also available as 09:00 express, please contact us
Lab: ALS DK