Sample type: Construction material etc.
Analysis type: Sample preparation etc.
Analysis of substance: | Report limit: |
---|---|
Grinding of for instance porous concrete
Package info
220 NOK / sample5 work days
1 work day
1
Construction material etc.
Sample preparation etc.
Yes, Fastest delivery 1 workday, 100% addition. 2 days: 75%, 3 days: 50%
No